IBM RS/6000 SP Manual de usuario

Busca en linea o descarga Manual de usuario para Unidades De Distribución De Energía (Pdu) IBM RS/6000 SP. IBM RS/6000 SP User's Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 114
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente

Indice de contenidos

Pagina 1 - SP Switch Service Guide

RS/6000 SPSP Switch Service GuideGA22-7443-04IBM

Pagina 2

viii RS/6000 SP: SP Switch Service Guide

Pagina 3

Multi-switch frame (F/C 2030/1)5-10 RS/6000 SP: SP Switch Service Guide

Pagina 4

Table 5-5. Multi-switch frame (F/C 2030/1)AssemblyindexPart number Units Description1 SPS Switch Assembly2 54G3281 16 Screw, Phil Pan Hd M5 x 123 93G1

Pagina 5 - Contents

5-12 RS/6000 SP: SP Switch Service Guide

Pagina 6

NoticesThis information was developed for products and services offered in the U.S.A.IBM may not offer the products, services, or features discussed i

Pagina 7

Electronic emissions noticesFederal Communications Commission (FCC) statementThis equipment has been tested and found to comply with the limits for a

Pagina 8

For installations in Japan:The following is a summary of the VCCI Japanese statement in the box above. This is a Class A productbased on the standard

Pagina 9

A-4 RS/6000 SP: SP Switch Service Guide

Pagina 10

IndexNumerics0375867 5-1104H9469 5-1108J5557 5-1111J3975 5-811J3976 5-811J3977 5-811J3978 5-811J3979 5-811J3980 5-811J3981 5-811J3982 5-811J5189 5-111

Pagina 11 - Safety notices

frame locations 2-3, 2-5, 2-6frame naming standard 2-1frame supervisor verification 3-5front chassis cable, SPS 1-8front view of 49-inch frame locatio

Pagina 12

SPS assembly, placing into service position 3-9SPS assembly, removing 4-2SPS assembly, replacing 4-2SPS assembly, replacing from service position 3-9S

Pagina 13 - Caution notices

Safety and environmental noticesFor general information concerning safety, refer toElectrical Safety for IBM Customer Engineers,S229-8124. For a copy

Pagina 14

X-4 RS/6000 SP: SP Switch Service Guide

Pagina 15 - Environmental notices

Reader’s comments – We’d like to hear from youRS/6000 SPSP Switch Service GuidePublication No. GA22-7443-04Overall, how satisfied are you with the inf

Pagina 16

Readers’ Comments — We’d Like to Hear from YouGA22-7443-04GA22-7443-04IBMCut or FoldAlong LineCut or FoldAlong LineFold and Tape Please do not staple

Pagina 19 - Summary of changes

DANGERBefore you connect the power cable of this product to ac power, verify that the power receptacleis correctly grounded and has the correct voltag

Pagina 20

DANGERThe remaining steps of the procedure contain measurements that are taken with power on.Remember that hazardous voltages are present. (SPSFD013)D

Pagina 21 - SP Switch MAPs

CAUTION:The covers are to be closed at all times except for service by trained service personnel.(SPSFC003)CAUTION:When the unit is being serviced, th

Pagina 22

CAUTION:v When moving frames into position, team members should work together. Using one person oneach corner of the frame can prevent strain.v In rai

Pagina 23 - Step 0590-001

This product might contain nickel-cadmium or lithium batteries in communication adapters. The batteriesmust be recycled or disposed of properly. Recyc

Pagina 24 - P/N 77G0818

About this bookThis book is part of the RS/6000®SP™hardware service library and applies to the RS/6000 SP Switch.Use this book to assist you in perfor

Pagina 25 - Step 0600-003

How to send your commentsYour feedback is important in helping to provide the most accurate and highest quality information. If youhave any comments a

Pagina 26 - Step 0600-007

Summary of changesGA22-7443-04This edition contains replaces GA22-7443-03 and any update versions made to that level and makes themobsolete. This edit

Pagina 28 - Step 0600-012

xviii RS/6000 SP: SP Switch Service Guide

Pagina 29 - Step 0600-016

Chapter 1. Maintenance Analysis Procedures (MAPs)This chapter provides information for identifying problems and guides you to the most likely failed F

Pagina 30 - Step 0600-020

FRUs include: Fans, circuit breaker/LED card, switch supervisor card, switch power card(s),inner chassis cable, front chassis cable, complete assembly

Pagina 31 - Step 0600-024

There are two LEDs on the front of each SP Switch. For quick reference, their definitions are as follows:Environment (Yellow)Off No environmental prob

Pagina 32 - Step 0600-028

Table 1-1. Switch problem diagnosticsPriority Message or condition Action1(1 of 3)Environmental problemsv Errpt: “Failure...”v Log: “Shutdown: Voltage

Pagina 33 - SP Switch power (MAP 0610)

SP Switch environment (MAP 0600)Purpose of this MAPThis MAP provides diagnostic information for switch problems that are related to the operatingenvir

Pagina 34 - Step 0610-004

Step 0600-004Perspectives indicated a shutdown condition and Table 1-2 on page 1-5 directed you to this step.1. One or more of the following condition

Pagina 35 - Step 0610-009

3. Is the measured resistance now within the acceptable range?v If yes, go to “Step 0600-017” on page 1-10 to verify fix.v If no, go to “Step 0600-008

Pagina 36 - Step 0610-012

Table 1-4. Fan failure diagnosticsPriority Component Action1(1 of 5)Fan 1, 2, 3, 4 or 5a. Check specified fans for blockages or loose cableconnections

Pagina 37 - SP Switch function (MAP 0620)

6. Check the Environmental (yellow) LED for an ON or FLASHING condition.7. Is the Environmental (yellow) LED ON or FLASHING?v If the Environmental LED

Pagina 38 - Step 0620-003

RS/6000 SPSP Switch Service GuideGA22-7443-04IBM

Pagina 39

2. Remove blockage.3. If required, put the switch into service position (refer to “Service position procedures” on page 3-9).4. With all cables replug

Pagina 40

2. Remove the switch supervisor card (refer to “Removing the switch supervisor card” on page 4-4).3. Using a digital multimeter, measure resistance at

Pagina 41 - Step 0620-004

Step 0600-025You have a PS1Fail problem1. Replace power supply card PS1.2. Reinstall the SPS front panel assembly, being careful to align the guide pi

Pagina 42 - System Service Guide

Step 0600-029You have a PSFuseGood problem that did not go away when you removed power supply PS1.1. Put the circuit breaker in the Off (‘0’) position

Pagina 43 - Step 0620-011

Step 0610-001A message in Perspectives indicated that you have a power problem and Table 1-1 on page 1-4 orTable 1-2 on page 1-5 directed you to this

Pagina 44

Step 0610-005When you put the circuit breaker into the On (‘1’) position, the circuit breaker tripped into the Off (‘0’)position.1. Have the customer

Pagina 45

v If yes:a. Have the customer remove the SP Switch from the active configuration and power off the SPSwitch.b. Go to “Step 0610-010”.v If no:a. Fix an

Pagina 46 - Step 0620-012

a. Replace the front chassis cable.b. Return to “Step 0610-004” on page 1-14 to verify the replacement cable.v If no:a. Replace the circuit breaker.b.

Pagina 47 - SP: System Service Guide

splstdata -n | pg5. From the system file server, log into “primary” processor node as root using the telnet command:telnetPrimaryNodename6. Check errp

Pagina 48

Table 1-7. SP Switch error conditionsError # Message/condition Description and action2(SPS)Initialized Description: Initialization detected a wrapped

Pagina 49 - Step 0620-023

Note!Before using this information and the product it supports, read the information in “Safety and environmental notices” onpage ix and “Notices” on

Pagina 50 - Step 0620-026

Table 1-7. SP Switch error conditions (continued)Error # Message/condition Description and action−3(SPS)Device status: Device has beenremoved from net

Pagina 51 - Step 0620-029

Table 1-7. SP Switch error conditions (continued)Error # Message/condition Description and action−8(SPS)Device status: Device has beenremoved from net

Pagina 52 - Step 0620-032

Refer to notes at beginning of “SP Switch function (MAP 0620)” on page 1-17 for more informationon cable connections and logical-to-physical frame tra

Pagina 53 - Step 0620-035

1. Make sure a wrap plug is properly installed on the connector. Refer to Figure 1-2 on page 1-4 for viewsof the switch wrap plugs.2. Have customer ch

Pagina 54 - Step 0620-038

v If yes:a. An SRN was obtained from diagnostics.b. Use the following SRN table (Table 1-9) to continue service.c. After using Table 1-9, go to “Step

Pagina 55 - Step 0620-042

Table 1-9. Service Request Number (SRN) table for SP Switch adapters (continued)Service Request NumberSRNsource Failing component(s) Description763-20

Pagina 56 - Step 0620-043

Table 1-9. Service Request Number (SRN) table for SP Switch adapters (continued)Service Request NumberSRNsource Failing component(s) Description764-2A

Pagina 57 - Chapter 2. Locations

Table 1-10. Switch problem priority listingPriority Failing component Action1(1 of 7)Software a. Have customer verify that the software is configureda

Pagina 58 - Connection location (ZZZZ)

Step 0620-013An SRN listed in Table 1-9 on page 1-24 indicated that you have a switch clock problem and Priority 2 inTable 1-10 on page 1-27 directed

Pagina 59 - Chapter 2. Locations 2-3

Step 0620-019Since the diagnostics did not return an SRN, no problem was detected.1. Have you just reseated, repaired, or replaced a component?v If ye

Pagina 60

ContentsFigures ...vTables ...viiSafety and environmental notices ...

Pagina 61 - Chapter 2. Locations 2-5

Note: When unplugging the two ends of the suspect cable, check /var/adm/SPlogs/css/out.top toverify only two (2) ports were lost. If four (4) ports we

Pagina 62 - Frame locations

v If yes, go to “Step 0620-027”.v If no:a. The problem switch is providing the master clock for the system.b. Have customer use the Eclock command to

Pagina 63 - Chapter 2. Locations 2-7

v S00-BH-J95. Disconnect the switch data cable at the tailgate of the frame containing the processor node.6. Connect the end of the processor node dat

Pagina 64 - Air Baffle

Step 0620-033All ground straps connecting the frames make adequate contact at both ends.1. Disconnect clock source data cable at S00-BH-J3, J5, J7, or

Pagina 65 - Cable routing

5. Set the switch clock selections on the “problem” switches (refer to “Selecting appropriate switch clocks”on page 3-6).6. Run advanced diagnostics o

Pagina 66

5. Look for an SRN indicating a clock problem, such as “External clock” being listed as one of the failingcomponents.6. Do the “css0” diagnostics fail

Pagina 67 - Chapter 2. Locations 2-11

2. Put the SP Switch’s circuit breaker into the On (‘1’) position.3. Go to “Step 0620-043” to verify fix.Step 0620-043You have replaced switch compone

Pagina 68

Chapter 2. LocationsNaming standard for RS/6000 SP components ...2-1Format structure ...2-1Example of fo

Pagina 69 - Switch data cables

– 01 - 99 for frames 1-99 (specific to that frame)Notes:1. E01 designates RS/6000 SP physical frame 12. L00 designates any/all RS/6000 SP logical fram

Pagina 70

Front and rear views of RS/6000 SP frameFigure 2-1 shows a front view of the RS/6000 SP frame locations. “Frame (FRA)” on page 2-6 describesthe assemb

Pagina 71 - Chapter 3. Service procedures

Selecting the switch clock source ...3-6Determining the correct switch clock source ...3-6Removing and restori

Pagina 72 - Table 3-2. Setup output files

Figure 2-2 shows a front view of the RS/6000 SP multi-switch frame.Figure 2-3 on page 2-5 shows a front view of the Model 3AX (49-inch) frame.Main Pow

Pagina 73 - Using the css.snap script

Figure notes:1. Wide processor nodes take up an entire shelf position (two thin processor node slots). They areidentified by the odd numbered position

Pagina 74 - Node supervisor verification

Note: See notes under Figure 2-1 on page 2-3 for processor node/switch assembly numbering.Frame locationsFigure 2-1 on page 2-3 shows a front view of

Pagina 75 - Frame supervisor verification

G6: Front door groundG7: Rear door groundG8: GroundSW: Power-on switchLD: LED cardFC: Front coverRC: Rear coverExample: E01-FRA-G1Chapter 2. Locations

Pagina 76

Switch assembly locationsFan 5P6 P4P5Fan 4 Fan 3Fan 2 Fan 1CB & LED CardJ1 J2Switch PlanarPowerSupply 2SupervisorCardPowerSupply 1Supervisor Bus

Pagina 77

Connector detailsFigure 2-6 shows RS/6000 SP component connector details.Cable routingFigure 2-7 on page 2-10 and Figure 2-8 on page 2-10 show back vi

Pagina 78 - Viewing switch partitions

Note: When attaching exterior and interior cables to a POWER3 SMP High Node allow for enough cablefor a 2-foot service loop for node movement into ser

Pagina 79 - Service position procedures

Table 2-1 shows external cable routing in a RS/6000 SP frame populated with 16 processor nodes. (Referto “Cable routing” on page 2-9 to see the routin

Pagina 80

Figure 2-9. Frame cable routing paths in rear of RS/6000 SP multi-switch frame (F/C 2030/1) — 1.93 m frameFigure 2-10. Frame cable routing paths in re

Pagina 81

Switch data cablesSPS data cablesTable 2-2 describes the attachment locations and routing for the internal SPS Switch data cables:Table 2-2. SPS Switc

Pagina 82

Figures1-1. SP Switch high-level diagram...1-21-2. SP Switch wrap plugs ...1-41-3. SP Switch inner chass

Pagina 83 - Antistatic bag

2-14 RS/6000 SP: SP Switch Service Guide

Pagina 84 - Replacing the switch assembly

Chapter 3. Service proceduresPersonal ESD requirements ...3-1Tools and files overview...3-1Using t

Pagina 85 - Replacing the switch fans

Table 3-1. Service procedure toolsUtility (see note) Runs on Descriptionfault_service_Worm_RTG All nodes Monitors the switch for faults. It restarts t

Pagina 86

Table 3-3. Tuning output files (continued)File (see note) Location Descriptiondaemon.stderr Primary A record of which nodes were not initialized.out.t

Pagina 87 - Supervisor

The files ending in .out are produced by running the appropriate command to dump internal (in memory)trace information or dump data to a file. The com

Pagina 88

2. In the Node pane, click the icon of the node you want to verify3. Click the ″Notebook″ icon on the tool barv When the Notebook window opens, make c

Pagina 89

v ″Yes″ displayed in a red box indicates that the switch supervisor has failed and it is notresponding to the frame supervisor.Note: Clicking ″Help″ i

Pagina 90

1 Input 1 (BH-J3 for SPS)2 Input 2 (BH-J4 for SPS)3 Input 3 (BH-J5 for SPS)Table 3-4. Setting switch clock sourcesModelNumber of LogicalFramesMaster C

Pagina 91 - Chapter 5. Parts catalog

6. The customer can re-initialize the switch using the Estart command. The frame and processor nodeswhich were removed in this procedure will appear i

Pagina 92

Efence of primary and primary backup nodesBy design, Efence of primary and primary backup nodes is not allowed.If you attempt to fence either of these

Pagina 93 - Chapter 5. Parts catalog 5-3

vi RS/6000 SP: SP Switch Service Guide

Pagina 94

d. Choose “Normal Mode”e. Choose “Display Current Bootlist”This will display the current bootlist.2. Power down the node, service it, and hook it back

Pagina 95 - Chapter 5. Parts catalog 5-5

The following 3 adapters require functional microcode to be installed:Adapter PackageESCON®Control Unit Adapters Feature 2756 ESCONBLKMUX S/370™Contro

Pagina 96

To complete the microcode update, it is usually necessary to remove and then replace the device from theconfiguration. The most reliable method to do

Pagina 97 - Chapter 5. Parts catalog 5-7

Chapter 4. FRU removals and replacementsHandling static-sensitive devices ...4-1Procedures for switch assemblies ...

Pagina 98 - Switch cables (feature)

Procedures for switch assembliesCAUTION:The unit weight exceeds 18 Kg (40 lbs) and requires two service personnel to lift.(SPSFC002)Attention: Compone

Pagina 99 - Chapter 5. Parts catalog 5-9

Removing the switch fansNote: Refer to “Handling static-sensitive devices” on page 4-1 before removing or installing ESD sensitivedevices.Perform thes

Pagina 100

Perform these procedures to remove the fan control cable from an SP Switch assembly:1. Perform “Placing a switch assembly into service position” on pa

Pagina 101 - Chapter 5. Parts catalog 5-11

Replacing the switch supervisor cardPerform these procedures to replace the supervisor card in an SP Switch assembly:1. Insert supervisor card.2. Rota

Pagina 102

Replacing the switch inner chassis cablePerform these procedures to replace the supervisor power cable from an SP Switch assembly:1. Plug connectors P

Pagina 103 - Trademarks

4. Remove power supply card.Replacing the switch power cardsPerform these procedures to replace the switch power cards) in an SP Switch assembly:1. In

Pagina 104 - European Union (EU) statement

Tables1-1. Switch problem diagnostics ...1-41-2. Environmental messages for switches ...1-51-3. Switch connect

Pagina 105 - Radio protection for Germany

4-8 RS/6000 SP: SP Switch Service Guide

Pagina 106

Chapter 5. Parts catalogSPS, SPS-8 Switch assembly (feature) (view 1) ...5-2SPS, SPS-8 Switch assembly (feature) (view 2) ...

Pagina 107

SPS, SPS-8 Switch assembly (feature) (view 1)5-2 RS/6000 SP: SP Switch Service Guide

Pagina 108

Table 5-1. SPS, SPS-8 Switch assembly (feature) (view 1)AssemblyindexPart number Units DescriptionSPS Switch assembly (reference only)SPS-8 Switch ass

Pagina 109 - Index X-3

SPS, SPS-8 Switch assembly (feature) (view 2)5-4 RS/6000 SP: SP Switch Service Guide

Pagina 110

Table 5-2. SPS, SPS-8 Switch assembly (feature) (view 2)AssemblyindexPart number Units DescriptionSPS Switch assembly (reference only)SPS-8 Switch ass

Pagina 111

SPS, SPS-8 Switch assembly (feature) (view 3)87654321Air flow5-6 RS/6000 SP: SP Switch Service Guide

Pagina 112 - GA22-7443-04

Table 5-3. SPS, SPS-8 Switch assembly (feature) (view 3)AssemblyindexPart number Units DescriptionSPS switch assembly (reference only)SPS-8 switch ass

Pagina 113

Switch cables (feature)Table 5-4. Switch cables (feature)AssemblyindexPart number Units DescriptionSP Switch data cables (SPS)11J6091 AR Cable, Switch

Pagina 114

Chapter 5. Parts catalog 5-9

Comentarios a estos manuales

Sin comentarios