Ibm C2B 2.25 Brick On Sled carrier 128-pin HPC Manual de usuario Pagina 35

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 88
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 34
USER RESPONSIBLE FOR VERIFYING VERSION AND COMPLETENESS
OEM FUNCTIONAL SPECIFICATION ULTRASTAR XP (DFHC) SSA MODELS 1.12/2.25 GB - 1.0" HIGH
Hot plugging the SSA link will be recognized by the next node which will cause a configuration process to
be started by the Initiators.
During hot plugging, the supplies must not go over the upper voltage limit. This means that proper ESD
protection must be used during the plugging event.
During hot un-plugging if the operating shock limit specification can be exceeded then the drive should be
issued a Start/Stop Unit command (spin down) that is allowed to complete before un-plugging.
Source filename=POWER IBM Corporation Page 35 of 87
Vista de pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 87 88

Comentarios a estos manuales

Sin comentarios