IBM S85 Manual de usuario

Busca en linea o descarga Manual de usuario para Servidores IBM S85. IBM S85 User's Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir

Indice de contenidos

Pagina 1 - Installation Guide

Enterprise Server S80pSeries 680 Model S85Installation GuideSA38-0582-00IBM

Pagina 2

v The7133 SSA Disk System: Operator Guide, order number xxxxxxx, describes howto operate the 7133 SSA Disk System and how to install or replace disk d

Pagina 3 - Contents

Chapter 1. System Installation ProcedureFollow the procedures in this chapter to install the Enterprise Server S80 and the pSeries 680 Model S85. The

Pagina 4

DANGERAn electrical outlet that is not correctly wired could place hazardous voltageon metal parts of the system or the devices that attach to the sys

Pagina 5 - Safety Notices

Refer to ″Specifications″ in the Enterprise Server S80 p Series 680 Model S85Service Guide, order number SA38-0560, for more planning information.Step

Pagina 6 - Laser Safety Information

__ 6. Have the customer turn on the branch circuit CB. Measure for appropriatevoltages between phases. If no voltage is present on the receptacle case

Pagina 7

b. Adjust the height of the leveling feet by rotating the leveling feet either upwardor downward according to the level of the surface on which the ra

Pagina 8

9. Hang the crank and tightening rod on the bracket near the bottom of the right wallinside the back of the rack.10. Install the rear stabilizer on th

Pagina 9 - About This Book

e. Adjust the bolts to the floor to ensure that the stabilizer is level and does notmove.11. If head protectors are installed, remove them from disket

Pagina 10 - Trademarks

v To a concrete floor, continue with “Attaching the I/O Rack to a Concrete Floor”.v To a concrete floor below a raised floor, go to “Attaching the I/O

Pagina 11 - Step 1. Inventory

10. Drill one hole in each group of anchor bolt location marks as indicated on themarked floor.11. Using at least three anchor bolts for each mounting

Pagina 12 - 2 S80, S85 Installation Guide

First Edition (November 2000)Before using this information and the product it supports, read the information in “Safety Notices” on page v,“Appendix B

Pagina 13

15. Place the four plastic isolator pads under the four leveling feet, and then level therack using the four adjustable leveling feet.16. Tighten the

Pagina 14 - 4 S80, S85 Installation Guide

2. Place the two mounting plates in the approximate mounting locations under therack.3. To align the rack over the mounting plates, do the following:a

Pagina 15 - Stabilizer

9. At the marked location of the tapped mounting holes, drill two holes approximately1 inch to allow clearance for the ends of the two rack-mounting b

Pagina 16 - Tightening

13. Place the two mounting plates on the locations indicated on the markedraised-floor panel.14. Using at least three anchor bolts for each mounting p

Pagina 17

c. Insert the rack-mounting bolts three to four rotations into the tapped holes.Note: The bottoms of the four leveling feet must be positioned over th

Pagina 18 - 8 S80, S85 Installation Guide

Notes:1. Ensure that the primary I/O rack (the primary I/O rack contains the serviceprocessor) is positioned on the right side of the system rack when

Pagina 19

b. Position the mounting plates under the four rack-mounting bolts so that themounting bolts are centered directly over the tapped holes.c. Insert the

Pagina 20 - S80, S85 Installation Guide

1. Install the 4 plate assemblies with the levelling feet, bushings, and washers. Makesure that the leveling feet are backed off the floor level to al

Pagina 21

concrete floor, some of the drilled holes may not be usable. For eachmounting plate, select at least three usable holes, two that are on oppositesides

Pagina 22 - Rack Mounting Bolts

2. Place the ground-cable lug through the mounting hole of the mounting plate.3. Connect the long end of the ground cable to the threaded side of the

Pagina 23

ContentsSafety Notices ...vElectrical Safety ...vLaser Safety Information ...viData Integr

Pagina 24

4. Find the crank (for installing the mounting screws) located inside the rear of the racknear the bottom of the right wall.MountingPlateFront of Rack

Pagina 25

5. Align the holes of the mounting plate with the holes on the rack, and then install thetwo mounting screws.6. Using the crank, tighten the two mount

Pagina 26

7. Store the crank inside the rear of the rack near the bottom of the right wall.Notes:1. If the customer does not want to connect an electrical outle

Pagina 27

2. After the customer has connected the power cable from the customer power sourceto the electrical outlet assembly, mount the electrical outlet assem

Pagina 28

5. Attach the mounting plate to the rack by installing and tightening the three mountingscrews.24 S80, S85 Installation Guide

Pagina 29

6. Connect the ground connector of the ground cable to the ground bus bar.7. If a drawer was removed from the bottom position of the rack, reinstall i

Pagina 30

Step 9. Remove the Shipping Brackets and Install Covers1. Remove any shipping materials from the system rack, I/O racks and from the frontand rear of

Pagina 31

3. Install any covers and shields that you have removed, or that were shippedseparately.Step 10. Install the I/O Rack Door Guide1. Locate the I/O rack

Pagina 32

Step 11. Connect the Operator Panel Cable and the JTAG Cable Between theRacksUsing the cables provided, connect the cables between the system rack and

Pagina 33

Step 14. Update the Device RecordsExternal devices used with the S80 and S85 systems are connected to connectors onthe primary I/O drawer or to adapte

Pagina 34

European Union (EU) Statement ...39International Electrotechnical Commission (IEC) Statement ...40United Kingdom Telecommunicatio

Pagina 35

v PDB circuit breakers CP1 - CP6 are set correctly (refer to “I/O Rack Rear Locations”on page 49 for locations)v Customer’s supply voltage is correct.

Pagina 36

If so, see ″Capacity Upgrade on Demand Processor Enabling″ inCapacityUpgrade on Demand Installing and Upgrading Processors,order numberSA38-0583, for

Pagina 37 - 10 EIA Unit Drawer

32 S80, S85 Installation Guide

Pagina 38 - Door Guide

Chapter 2. Using the System Verification ProcedureThe system verification procedure is used to check the system for correct operation.If you are analy

Pagina 39 - Checklist If Problems Occur

a. When the keyboard indicator appears, press the 5 key on the keyboard to loadthe standalone diagnostics or press the 6 key to load the online diagno

Pagina 40

3. This completes the system verification. Report the SRN if you received one to theservice organization. To do a normal boot, turn off the system uni

Pagina 41 - Capacity

36 S80, S85 Installation Guide

Pagina 42

Chapter 3. Installing Options for Your SystemThere are no customer-installable options for the Enterprise Server S80 or the p Series680 Model S85.The

Pagina 43

38 S80, S85 Installation Guide

Pagina 44

Appendix A. Communications StatementsThe following statement applies to this product. The statement for other productsintended for use with this produ

Pagina 45

Safety NoticesAdangernotice indicates the presence of a hazard that has the potential of causingdeath or serious personal injury.Acautionnotice indica

Pagina 46

International Electrotechnical Commission (IEC) StatementThis product has been designed and built to comply with IEC Standard 950.United Kingdom Telec

Pagina 47 - Capacity Upgrade on

Electromagnetic Interference (EMI) Statement - TaiwanThe following is a summary of the EMI Taiwan statement above.Warning: This is a Class A product.

Pagina 48

42 S80, S85 Installation Guide

Pagina 49 - European Union (EU) Statement

Appendix B. Environmental NoticesProduct Recycling and DisposalThis unit contains materials such as circuit boards and connectors with lead that requi

Pagina 50 - VCCI Statement

44 S80, S85 Installation Guide

Pagina 51 - Radio Protection for Germany

Appendix C. NoticesThis information was developed for products and services offered in the U.S.A.The manufacturer may not offer the products, services

Pagina 52

46 S80, S85 Installation Guide

Pagina 53 - Unit Emissions

Appendix D. Cabling the System Rack and I/O RackThe minimum system consists of two racks. The system rack contains the systemprocessors, memory and su

Pagina 54

Connecting JTAG and Operator Panel CablesUse the following figure to connect the JTAG and operator panel (OP) cables.OPFront of System RackRear of Pri

Pagina 55 - Appendix C. Notices

I/O Rack Rear LocationsThe following figure shows the rear of an I/O rack. 10 EIA unit I/O drawers can beinstalled, as shown in the figure.PowerDistri

Pagina 56

Laser Safety InformationThe optical drive in this system unit is a laser product. The optical drive has a label thatidentifies its classification. The

Pagina 57

I/O Drawer LocationsThis section shows component locations for the 10 EIA unit I/O drawer.10 EIA Unit I/O Drawer Front ViewNote: The SCSI IDs shown fo

Pagina 58

10 EIA Unit I/O Drawer Rear View1. PCI adapter slots (1 - 7)2. PCI adapter slot 8, service processor card and JTAG cable in primary I/O drawer(drawer

Pagina 59 - I/O Rack Rear Locations

Note: In an RS/6000 SP environment, there is normally a cable attached from thisport to the SP Control Workstation. To directly attach a TTY terminal

Pagina 60 - I/O Drawer Locations

10 EIA Unit I/O Drawer System board LocationsJ1 RIO busJ2 RIO busJ3 SPCN connectorJ4 PCI slot 2, controller 1J5 PCI slot 3, controller 1J6 PCI slot 4,

Pagina 61

J10 PCI slot 11, controller 2J11 PCI slot 12, controller 2J12 PCI slot 13, controller 2J13 PCI slot 1, controller 1J14 PCI slot 5, controller 0J15 PCI

Pagina 62

Service Processor Card LocationsJ1 JTAG connector to system rackJ2 Serial port connector to inside bulkhead cardJ3 Speaker connectorJ4 Diskette drive

Pagina 63

Fan Monitor Control (FMC) Card Locations (10 EIA Unit I/O Drawer)J1 To Power Distribution BoardJ2 Fan 2 (Left Blower)J3 Fan 1 (Center Blower)J4 Fan 3

Pagina 64

J5 +12 V dc, −12 V dcJ6 +5VdcJ7 +5VdcJ8 I35 SCSI backplane power connectorJ9 Media bay power connectorJ10 +5VdcJ11 Fan monitoring card connectorConnec

Pagina 65

System Rack Attached to One I/O DrawerSystem Rack Attached to Two I/O DrawersOR21SPCNRIO 1RIO 0Drawer 0, PrimaryRIO 1RIO 0RIO 2RIO 3J14J11SPCN 0, J15S

Pagina 66

System Rack Attached to Three I/O DrawersSystem Rack Attached to Four I/O DrawersRIO 1RIO 021SPCN21SPCNRIO 1RIO 0Drawer 0Drawer 2RIO 1RIO 0RIO 2RIO 3J

Pagina 67

Data Integrity and VerificationIBM computer systems contain mechanisms designed to reduce the possibility ofundetected data corruption or loss. This r

Pagina 68 - Drawer 1

SPCN CablingThe following figures provide cabling examples for all valid cabling configurations.Match your configuration to the correct figure and con

Pagina 69 - Drawer 2

System Rack Attached to Three I/O DrawersSystem Rack Attached to Four I/O DrawersRIO 1RIO 021SPCN21SPCNRIO 1RIO 0Drawer 0Drawer 1 or 2RIO 1RIO 0RIO 2

Pagina 70 - SPCN Cabling

RIO 1RIO 1RIO 0RIO 02211SPCNSPCNDrawer 1Drawer 2Drawer 3RIO 1RIO 021SPCN21SPCNRIO 1RIO 0Drawer 0RIO 1RIO 0RIO 2 RIO 3J14J11SPCN 0, J15SPCN 1, J1662 S8

Pagina 71 - Drawer 1 or 2

Appendix E. System RecordsUse this appendix to keep a record of your system configuration. Pages are providedfor system information, cabling diagrams,

Pagina 72 - Drawer 3

S80 and S85 System Rack Cabling Configurations - SPCN CablingUse the following diagram to record the SPCN cabling configuration from the systemrack to

Pagina 73 - Appendix E. System Records

Primary I/O Drawer Device RecordsUse the following tables to keep a record of the options installed in or attached to yoursystem. This information can

Pagina 74

Table 1. Internal and External Options in Primary Drawer (0) (continued)Serial Port 2Refer to the following diagram of your server’s banks/bays when c

Pagina 75

Table 2. Internal Files and Devices in Primary Drawer (0) 10 EIA Unit I/ODrawer (continued)Location/Drive SCSI ID Drive DescriptionBank A, Bay 1 5Bank

Pagina 76 - 10 EIA Unit I/O Drawer

Additional I/O Drawer Device RecordsUse the following tables to keep a record of the options installed in or attached to yoursystem. This information

Pagina 77 - Drawer (continued)

Table 4. Internal and External Options in Secondary Drawer (2) (continued)Expansion Slot 14Expansion Slot 13Expansion Slot 12Expansion Slot 11Expansio

Pagina 78

viii S80, S85 Installation Guide

Pagina 79

Table 5. Internal and External Options in Secondary Drawer (3) (continued)Expansion Slot 10Expansion Slot 9Expansion Slot 8Expansion Slot 7Expansion S

Pagina 80

IndexAabout this book ixBbatterydisposal, recycling 43CcablesJTAG 48operator panel 48RIO 57SPCN 57, 60cabling 47connecting cables 47connecting the sys

Pagina 81

72 S80, S85 Installation Guide

Pagina 82

Reader’s Comments — We’d Like to Hear From YouTitle: Enterprise Server S80 p Series 680 Model S85 Installation GuideOrder Number: 09P1686Overall how s

Pagina 83

Fold and TapeFold and TapePlease do not StaplePlease do not StapleFold and TapeFold and TapeInformation DevelopmentDepartment H6DS-956111400 Burnet Ro

Pagina 85

IBMRPart Number: 09P1686Printed in the United States of Americaon recycled paper containing 10%recovered post-consumer fiber.November 2000SA38-0582-00

Pagina 86 - Part Number: 09P1686

About This BookThis book provides information on how to setup and install the system, use diagnostics,use service aids, and verify system operation. T

Comentarios a estos manuales

Sin comentarios